ELECTRIC POWER BOOSTING


ELECTRIC POWER BOOSTING

In cases where the electrical installation is insufficient, it is necessary to make a power increase request to the energy distribution company in order to increase the power of the installed installation. Some procedures are operated for this. After the necessary requests, the installed power increase process is carried out by the experienced personnel of the authorised electrical companies.

All procedures require the approval of the electricity distribution company. After the power increase request is made, the electricity power increase fee must be paid. After the request, the connection power calculation is made.

Power Increase Request Procedure
According to the Electricity Market Connection and System Utilisation Regulation, users connected to the electricity distribution system or a user outside the system may request a power increase. It is necessary to request an increase in installed power within 30 days from the date of notification.

Electricity consumers can request a change in the contract by making a power increase request to increase or decrease the contract power specified in the electricity invoices. If an increase in the installed power is required due to the requested power, the consumer must submit a power increase project during the application.

The electricity distribution company examines the consumer's electricity power increase request and responds positively or negatively within 10 business days. For the power increase request that requires a field survey, a response is given within 20 working days. If it is found appropriate to make changes within the scope of the contract power, the connection agreement is amended to include power increase transactions.

The power increase request must be made within the framework of the provisions of the Electricity Market Connection and System Utilisation Regulation. Power increase can be requested at most 3 times in a year. If it is determined that those whose request is not accepted consume more than the contract power within the following 6-month period, sanctions are imposed according to the provisions of the regulation.

Documents Required for Power Increase Request
Different fees or documents may be requested in BEDAŞ power increase or Boğaziçi electricity power increase transactions.
The documents required for the power increase request are as follows;
For individuals

Photocopy of title deed or lease contract
Photocopy of identity card of the property owner
Power of Attorney
For private companies:

Photocopy of title deed or lease contract
Photocopy of Tax Certificate
Copy of signature declaration
Photocopy of the authorised person's identity card
Power of Attorney
For limited liability and joint stock companies:

Photocopy of title deed or lease contract
Photocopy of Tax Certificate
Commercial Registry Gazette
Copy of signature circular
Photocopy of activity certificate
Photocopy of authorised identity card
Things to Know About Power Boosting
What should be known about power increase? We have explained them all in detail. The concepts of "contract power, power increase project", which are among the most frequently asked questions of electricity users who are faced with situations such as power increase, are terms that concern the existing electrical installations of users. Contract power refers to the kilowatt-based value determined by calculating the current connection power of the users' installations on electricity contracts.

In the event that the connection power value specified on the contract is exceeded, the electricity grid sends a warning to its corporate or individual customers that the value specified on the connection contract has been exceeded and recommends a power increase. At this point, the need for a power increase project arises, which is an installation plan that covers all electrical appliances of the electricity user and can be sufficient for daily electricity use.

 

 

Curious Details About Power Increase Project and Connection Agreement?
The power increase project is defined as the installation projects that must be drawn if the existing electrical installations of corporate or individual electricity users do not meet the daily electricity load. The electricity power increase project starts with the review of the entire electrical infrastructure of the building, taking into account the criteria determined by electrical engineers.

In this process, an electrical infrastructure that can handle the electrical load is built by eliminating the problems that cause inadequate use and power exceedance in the existing installation. While strengthening the existing electrical installation, the load created by the electrical appliances used in the property on the installation is also taken into consideration. After the power increase project is completed, the user increases the contract power value with the connection agreement signed with the distribution network.

Why are Power Increase Projects Important for Power Change Request?
Power increase projects, the details of which are drawn by experts such as electrical engineers, are of great importance primarily in terms of ensuring that the existing installation infrastructure used in the workplace or at home is sufficient to meet the use of electricity.

The power increase project, whose plan will be drawn in this direction, creates an infrastructure with a connection power that can carry the load of all electronic devices owned by the electricity user. The power increase, which will increase the efficiency of use, also allows to increase the amount of power determined between the user and the distribution network in the electricity contract.

In other words, in cases where the current usage of corporate or individual electricity users who will have power increase is not sufficient, a higher connection power need arises on kilowatt basis. If this need is not met, the excess electrical load on the line causes the line to short circuit due to overload.

Situations such as short circuit may adversely affect the daily use of electricity and may also damage the electrical appliances used at work or at home. In order to prevent the aforementioned negativities, users can complete the necessary documents and project design processes and apply for power change requests and applications to the necessary institutions with power increase project drafts.

What are the Documents Required for Power Increase?
Users who want to increase power should renew their electricity contracts and apply to the right places with the necessary documents in order to increase the amount of contract power specified on the contract. The documents required for power increase include documents such as the person's identity document, photocopy of the identity document, title deed document or lease contract document and electricity bill if the existing property is rented.

If these documents are missing or insufficient, the power increase applications will be deemed invalid and the process will be suspended until the documents are re-submitted. Likewise, individuals or organisations that will apply for electricity power increase must also fulfil a number of procedures if their existing installations are insufficient.

The most important among these procedures are the power increase projects, the details of which we mentioned above. If the aforementioned infrastructure and installation problems are eliminated with power increase projects, the person can apply to the distribution network for power increase.